Permit number: RUP2023-0983
Project contact: Raquel Dusseault
BERNARD AVE to DOYLE AVE
January 19, 2024 (All day)
Local Traffic Only, No Through Traffic, Detour
BERNARD AVE to DOYLE AVE
January 23, 2024 (All day)
Local Traffic Only, No Through Traffic, Detour
BERNARD AVE to DOYLE AVE
January 1, 2024 (All day) to July 1, 2024 (All day)
Lane Drop - Multi Lane Road
BERNARD AVE to DOYLE AVE
January 1, 2024 - 7:00am to July 1, 2024 - 4:00pm
Lane Drop - Multi Lane Road
Permit number: RUP2024-0041
Project contact: Craig Donoghue
Phone: 250-487-8102
SOUTH END OF ROAD to WALNUT ST
January 19, 2024 (All day)
Local Traffic Only, No Through Traffic, Detour
3377 Lakeshore Rd - Lakeshore Rd 3477 & Richter - deliveries, concrete pours etc for this project.
Permit number: RUP2023-0989
Project contact: Taija Jagodnik
SWORDY RD to RICHTER ST
January 1, 2024 - 7:00am to August 31, 2024 - 6:00pm
Lane Drop - Multi Lane Road
710 KLO Rd (back Lane closure ) - closure of back lane for construction purposes
Permit number: RUP2024-0015
Project contact: Patrick Burgon
KLO RD to LANE
January 1, 2024 (All day) to January 31, 2024 (All day)
Local Traffic Only, No Through Traffic, Detour
Abbott St 3061-3095 - I’m with Metric Civil and we have an electrical conduit crossing going east west crossing Abbott road at 3061-3095 for the Alma Apartment complex. We will be excavating with a small excavator at a max depth of 1.2m, please let me
Permit number: RUP2024-0033
Project contact: Sheilan Laing
Phone: 604-845-6113
MEIKLE AVE to NEWSOM AVE
January 8, 2024 - 7:30am to February 8, 2024 - 4:30pm
Single Lane Alternating
att Rd @ 3340 Lakeshore Rd - temporary staging area, safety buffer and construction fencing to separate public from construction activities
Permit number: RUP2023-0985
Project contact: Marc Redka
Phone: 250-870-2825
SOUTH END OF ROAD to WALNUT ST
January 1, 2024 (All day) to January 31, 2024 (All day)
No Disruption
Belaire 1365 / Chandler St 1840 & 1850 - use of frontage including sidewalk for site office, garage disposal C-can, loading and unloading of trucks. Site is fully fenced.
Permit number: RUP2024-0056
Project contact: Clayton Unruh
Phone: 778-215-1187
DEVONSHIRE AVE to CHANDLER ST
January 1, 2024 (All day) to May 31, 2024 (All day)
No Disruption
PRIDHAM AVE to BELAIRE AVE
January 1, 2024 (All day) to May 31, 2024 (All day)
No Disruption
Boynton Pl 630 - parking space and sidewalk use for construction in area.
Permit number: RUP2024-0023
Project contact: Thomas Leney
Phone: 236-878-9113
HIGHPOINTE DR to CARAMILLO RD
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Capozzi Rd 3838 / Truswell - Truswell hoarding permit to accommodate our frontage improvements. TMP is in place from previous permits.
Permit number: RUP2024-0012
Project contact: Luca Salis
Phone: 403-703-7192
CAPOZZI RD to COOK RD
January 1, 2024 - 7:00am to June 30, 2024 - 9:00pm
No Disruption
Cara Glen Court 1455 - Debri bins and equipment parked on City road shoulder for construction underway
Permit number: RUP2023-0976
Project contact: Sean Moraes
SOUTH END OF ROAD to CARA GLEN WAY
January 1, 2024 (All day) to June 1, 2024 (All day)
No Disruption
Cara Glen Crt 1430 - Site office trailer parked on City street. Using approx 3 parking stalls. 67 sq meters
Permit number: RUP2024-0028
Project contact: Justin Law
SOUTH END OF ROAD to CARA GLEN WAY
January 1, 2024 (All day) to March 31, 2024 (All day)
No Disruption
Cawston Ave 604 - usage of Cawston Ave and multi u-use pathway for construction deliveries and hoisting. Road and path will only be temporarily closed during work hours. They will be opened by the end of every work day. It won't be very frequent and we
Permit number: RUP2024-0045
Project contact: John Downs
Phone: 778-363-2779
DEAD END to CORONATION AVE
January 9, 2024 - 7:00am to January 31, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
DEAD END to CORONATION AVE
January 9, 2024 - 7:00am to January 31, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
ST. PAUL ST to LANE
January 9, 2024 - 7:00am to January 31, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
ST. PAUL ST to LANE
January 9, 2024 - 7:00am to January 31, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
BERTRAM ST to RICHTER ST
January 9, 2024 - 7:00am to January 31, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
Comment:Abbott St 3061/Cedar Ave - extend construction fencing to the edge of the roadway to allow for a safer work area for site personnel as well as the general public. Ongoing construction of an 87 unit wood frame, 7 story building.
Permit number: RUP2023-0972
Project contact: Gary Klassen/Kanina Wright
Phone: 250-448-8810
MEIKLE AVE to NEWSOM AVE
January 1, 2024 - 7:00am to December 31, 2024 - 5:00pm
No Disruption
ABBOTT ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:00pm
No Disruption
Comment:Benvoulin Rd @ 2241 Springfield Rd - trucks hauling on and off site with earth materials. Few intermittent interruptions. No real traffic interruptions. Will follow rules of the road.
Permit number: RUP2024-0006
Project contact: Jeff Walowski
Phone: 204-777-1972
BENVOULIN CT to BENVOULIN RD
January 2, 2024 - 9:00am to February 2, 2024 - 5:00pm
Lane Drop - Multi Lane Road
Comment:Bernard Ave 313 - demo of exterior stucco, install new siding & paint. Remove and replace windows. Erect scaffolding. Pedestrians will be able to walk thru.
Permit number: RUP2024-0001
Project contact: Chris Van Dassen
LAWRENCE AVE to BERNARD AVE
January 1, 2024 - 7:00am to February 29, 2024 - 3:00pm
No Disruption
WATER ST to PANDOSY ST
January 1, 2024 - 7:00am to February 29, 2024 - 3:00pm
No Disruption
Comment:Osprey Ave 540 - close off the end of the lane to the north of 540 Osprey to house site trailer, Porta Potty. and garbage bin during construction. Adding catch basins.
Permit number: RUP2024-0016
PANDOSY ST to MCKAY AVE
January 1, 2024 - 7:00am to February 29, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
Coronation Ave 1036 - use of sidewalk and road shoulder for construction purposes.
Permit number: RUP2024-0057
Project contact: Sarb Hayer
GRAHAM ST to GORDON DR
January 1, 2024 (All day) to January 31, 2024 (All day)
No Disruption
GRAHAM ST to GORDON DR
January 1, 2024 (All day) to January 31, 2024 (All day)
No Disruption
Coronation Ave 620 - construction of apartment. Fencing on City property.
Permit number: RUP2023-0968
Project contact: Johannes van Leenen
Phone: 250-526-5971
ST PAUL ST to RICHTER ST
January 1, 2024 (All day) to March 31, 2024 (All day)
No Disruption
Dayton Street Bridge Arch Span at Hwy 07 - removal of concrete and rebar and installation of new concrete and rebar.
Permit number: RUP2023-0966
Project contact: Jeff Caldwell
SUTHERLAND AVE to KIRSCHNER RD
December 23, 2023 - 7:00am to January 30, 2024 - 4:30pm
Lane Drop - Multi Lane Road
Devonshire Ave 1274 - Deliveries and any traffic interruptions.
Permit number: RUP2024-0026
Project contact: Marlon Kotter
Phone: 250-300-5093
PRIDHAM AVE to BELAIRE AVE
January 1, 2024 (All day) to August 31, 2024 (All day)
Lane Drop - Multi Lane Road
Dougall Rd N 285 - pouring concrete walls and pump truck will block road access on Dougall Rd on select days only. Roadway will be unobstructed on majority of days otherwise.
Permit number: RUP2023-0965
Project contact: Will Monforton
SHEPHERD RD to MCINTOSH RD
December 23, 2023 - 7:00am to February 5, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
DOUGALL RD N to ASHER RD
December 23, 2023 - 7:00am to February 5, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
Dougall Rd N 540 - staging area to facilitate construction of 124 unit residential rental building. Site Trailer
Permit number: RUP2024-0047
Project contact: Zach Ireland
Phone: 226-979-5075
MCINTOSH RD to LEATHEAD RD
December 24, 2023 (All day) to April 30, 2024 (All day)
No Disruption
Doyle Ave 550 / St Paul St- Jersey barrier set up along alley, Doyle Ave and St Paul for public safety from construction traffic and future excavation
Permit number: RUP2023-0973
Project contact: Lauren Cooper
ST PAUL ST to BERTRAM ST
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Ellis St 1095 - siding installation on Ellis side walks of the building. (sidewalk east side) Pedestrian provided detour route and signs posted.
Permit number: RUP2024-0013
Project contact: Peter Uitto
GASTON AVE to INDUSTRIAL AVE
January 1, 2024 - 7:00am to February 2, 2024 - 4:00pm
No Disruption
Enterprise Way / Cary Rd - CCTV inspection of storm line on Cary RD, south East of Enterprise Way. CCTV of storm line from Enterprise Way and under Cary Rd is required to be televised. Storm line plan is available upon request, showing exact location of
Permit number: RUP2024-0052
Project contact: Jason Murray
Phone: 780-447-4225
HWY 33 W to CARY RD
January 17, 2024 -
10:00am to 3:00pm
Lane Drop - Multi Lane Road
ENTERPRISE WAY to HWY 97 N
January 17, 2024 -
10:00am to 3:00pm
Lane Drop - Multi Lane Road
CARY RD to COMMERCE AVE
January 17, 2024 -
10:00am to 3:00pm
Lane Drop - Multi Lane Road
Fortis Seasonal Permit - all overhead works. No excavation work only. Various City Streets
Permit number: RUP2024-0005
Project contact: Dustin Bates
Phone: 250-717-0828
DE MONTREUIL CT to LOWE CT
January 22, 2024 -
12:30pm to 3:00pm
Lane Drop - Multi Lane Road
SPALL RD to HARDY ST
January 23, 2024 - 9:00am to March 23, 2024 - 3:00pm
Lane Drop - Multi Lane Road
CASORSO RD to DE MONTREUIL CT
January 22, 2024 -
12:30pm to 3:00pm
Lane Drop - Multi Lane Road
Gordon Dr 1605 (used to be 1116-1149 Lawrence Ave) - move existing streetlight base and rewire.
Permit number: RUP2024-0054
Project contact: Steve
Phone: 250-870-4549
LEON AVE to LAWRENCE AVE
January 16, 2024 - 9:00am to January 19, 2024 - 3:00pm
Lane Drop - Multi Lane Road
Irrigation Water Blow-Off Repair - Feeney Rd 3807
Permit number: RUP2024-0044
Project contact: Cody Beitel
Phone: 250-469-8424
WATER RD to WEST END OF ROAD
January 11, 2024 - 7:00am to January 26, 2024 - 3:00pm
Single Lane Alternating
KLO Rd & Hall Rd - Telus Utility aerial placing. deliver fiber to the customers home, will need to access 3 poles on KLO Rd. We will also be bringing fiber across the road from pole to pole and will need the help of traffic control to briefly control tra
Permit number: RUP2024-0053
Project contact: Hailey Schmidt
Phone: 780-868-4159
SPIERS RD to HALL RD
January 24, 2024 - 9:30am to January 25, 2024 - 3:00pm
Single Lane Alternating
KLO RD to MARIPOSA CT
January 24, 2024 - 9:30am to January 25, 2024 - 3:00pm
Single Lane Alternating
KLO Rd @ Holland Rd - access 3 poles on KLO to deliver fiber to the customers home.
Permit number: RUP2024-0062
Project contact: Jacki Thoreson
Phone: 780-868-4159
HOLLAND RD to ST AMAND RD
January 24, 2024 - 9:30am to January 25, 2024 - 3:00pm
Lane Drop - Multi Lane Road
KLO RD to NORTH END OF ROAD
January 24, 2024 - 9:30am to January 25, 2024 - 3:00pm
Lane Drop - Multi Lane Road
Lakeshore Rd 3101/KLO Rd - sidewalk adjacent to KLO will be closed and pedestrian traffic diverted at the crosswalk. Along Lakeshore the curb lane will be closed and temporary sidewalk created as discussed with COK staff. Closure area along KLO & Lakeshor
Permit number: RUP2023-0986
Project contact: Jeromy Jobke
Phone: 250-809-0662
LANFRANCO RD to CEDAR AVE
December 23, 2023 (All day) to May 15, 2024 (All day)
Lane Drop - Multi Lane Road
CEDAR AVE to TUTT ST
December 23, 2023 (All day) to May 15, 2024 (All day)
Lane Drop - Multi Lane Road
Lakeshore Rd 3340 - install underground power service. All previous work completed and restored. Only working on Swordy for now. Will advise when they move on.
Permit number: RUP2024-0035
Project contact: Rob Reitman
Phone: 250-862-6720
LAKESHORE RD to LANDIE RD
January 8, 2024 - 7:00am to January 30, 2024 - 5:30pm
Lane Drop - Multi Lane Road
LANDIE RD to PATSY RD
January 8, 2024 - 7:00am to January 30, 2024 - 5:30pm
Lane Drop - Multi Lane Road
Lawrence Ave 1131 (Formerly 1605 Gordon Dr) - build 6 story building. Facilitate material drop off without distrubance to traffic on Gordon Dr, the contractor wishes to use the lane currently used for a bus stop and public parking. They will separate th
Permit number: RUP2023-0971
Project contact: Ryan Seddon
Phone: 250-808-4079
GORDON DR to CENTENNIAL CR
January 1, 2024 (All day) to January 31, 2024 (All day)
Lane Drop - Multi Lane Road
GORDON DR to CENTENNIAL CR
January 1, 2024 (All day) to January 31, 2024 (All day)
Lane Drop - Multi Lane Road
Leathead Rd 540 - 405 - install shallow utilities along lane out to Leathead Rd/ NB & SB laneway bet Dougall Rd N & Forelich Rd
Permit number: RUP2023-0979
Project contact: Douglas Niles
Phone: 250-986-6644
MCINTOSH RD to LEATHEAD RD
January 1, 2024 - 7:30am to February 14, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
MCINTOSH RD to LEATHEAD RD
January 1, 2024 - 7:30am to February 14, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
Leon Ave 278 - deliveries to site, off loading and loading, personnel entering or exiting
Permit number: RUP2023-0015
Project contact: Stephanie Mattson
ABBOTT ST to WATER ST
January 5, 2023 (All day) to May 5, 2024 (All day)
Lane Drop - Multi Lane Road, Continually Moving Work, No Disruption
Leon Ave 278 - off loading and pumping concrete. Deliveries to site. Personnel entering or exiting site. Intermittent.
Permit number: RUP2023-0969
Project contact: Stephanie Mattson
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Leon Ave 278 Hoarding Permit Issued - to show permit in place. However, fees will be waived due to Amega being charged by the Parking Dept for parking stalls all along Leon Ave. Fees will be collected for parking spaces which will include the Hoarding.
Permit number: RUP2023-0970
Project contact: Stephanie Mattson
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Locate curb stop for water off - Truswell Rd 3896
Permit number: RUP2024-0060
Project contact: Cody Beitel
Phone: 250-469-8424
MISSION CREEK to CAPOZZI RD
January 15, 2024 - 7:00am to January 19, 2024 - 3:00pm
No Disruption
McKenzie Rd 1271 - Water service repair on private property. Equipment will need to take up the lane/shoulder.
Permit number: RUP2024-0064
Project contact: Jeff Clark
RICHTER ST to CURTS ST
January 22, 2024 - 7:00am to January 24, 2024 - 6:00pm
Single Lane Alternating
Moss Crt - Set up trailer and laydown yard on Moss Crt adjacent to site.
Permit number: RUP2023-0975
Project contact: Andreas Hayer
SOUTH END OF ROAD to EVERGREEN CT
January 1, 2024 (All day) to June 30, 2024 (All day)
No Disruption
Mountain Ave 1390 - install pipe behind curb. to street light. Work with Fortis to have a outage, install transformer and new street light base.
Permit number: RUP2024-0011
Project contact: Randy Frasch
MONTEREY CR to GARLAND ST
January 3, 2024 - 7:00am to January 26, 2024 - 3:30pm
Lane Drop - Multi Lane Road
Old Vernon Rd WB @ Hwy 97 N 3953 - NIGHT WORK sanitary & storm sewer tie-in, Water tie-in. Median removals and replace as a direct result from the tie-ins.
Permit number: RUP2023-0908
Project contact: Steven McGillis
HWY 97 N to OLD VERNON RD
January 8, 2024 - 6:00pm to January 19, 2024 - 6:00am
Local Traffic Only, No Through Traffic, Detour
SEXSMITH RD to ACLAND RD
January 8, 2024 - 6:00pm to January 19, 2024 - 6:00am
Local Traffic Only, No Through Traffic, Detour
Osprey Ave 550 - close road for construction purposes, crane work, concrete work and deliveries.
Permit number: RUP2024-0017
Project contact: Vic Vachon
PANDOSY ST to MCKAY AVE
January 1, 2024 - 7:00am to January 31, 2024 - 5:00pm
No Through Traffic, Detour
PANDOSY ST to OSPREY AVE
January 1, 2024 - 7:00am to January 31, 2024 - 5:00pm
No Through Traffic, Detour
Raymer Ave 750 - loading and unloading delivery trucks once a week. Temporary closure of pedestrians walkway when the site has deliveries with traffic control
Permit number: RUP2024-0063
Project contact: Manny Mehrok
RICHTER ST to CURTS ST
January 16, 2024 (All day) to May 15, 2024 (All day)
Lane Drop - Multi Lane Road
Royal Ave & Long St - laydown and trailer site/seacan placement.
Permit number: RUP2023-0990
Project contact: Brady Allen
LONG ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:30pm
Lane Drop - Multi Lane Road
Rutland Rd 1354 - replace 2 poles along Rutland Rd as per attached NTP
Permit number: RUP2023-0982
WALLACE RD to KLASSEN RD
January 11, 2024 - 8:00am to January 19, 2024 - 4:00pm
Lane Drop - Multi Lane Road
Sanitary Sewer Upgrades Phase 4 thru 8 - All previous work completed and surface restoration done. Starting on Phase 4 and up. Sanitary Sewer upgrade install. Working on Adventure Rd Only till the end of January 2024. TMP attached in PDF with RUP appli
Permit number: RUP2024-0036
Project contact: Rob Reitman
Phone: 250-862-6720
VENUS RD to BENCHVIEW RD
January 8, 2024 - 7:00am to January 31, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
BENCHVIEW RD to DOUGALL RD S
January 8, 2024 - 7:00am to January 31, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
Saucier Ave 812 - closure of sidewalk, shoulder and single westbound lane of Saucier Ave. Site hoarding will be for approx 2 years.
Permit number: RUP2023-0987
Project contact: Brodie Scott
RICHTER ST to ETHEL ST
January 1, 2024 - 7:00am to December 31, 2024 - 7:00pm
Single Lane Alternating
Springfield RD @ Ambrosi Rd 1946 - Off loading prefabricated walls and framing material and construction fence on City sidewalk. Less than a foot onto the sidewalk and 1.2 m will be maintained at all times. Trip feet will be installed on the bottom of the
Permit number: RUP2023-0974
Project contact: Andreas Hayer
SPRINGFIELD RD to AGASSIZ RD
January 1, 2024 - 7:00am to June 30, 2024 - 5:00pm
No Disruption
AMBROSI RD to BARLEE RD
January 1, 2024 - 7:00am to June 30, 2024 - 5:00pm
No Disruption
This is part of Permit # 2023-0974 Springfield RD @ Ambrosi Rd 1946 - Off loading prefabricated walls and framing material and construction fence on City sidewalk. Less than a foot onto the sidewalk and 1.2 m will be maintained at all times. Trip feet wi
Permit number: RUP2024-0004
Project contact: Andreas Hayer
SPRINGFIELD RD to AGASSIZ RD
January 1, 2024 (All day) to June 30, 2024 (All day)
Lane Drop - Multi Lane Road
AMBROSI RD to BARLEE RD
January 1, 2024 (All day) to June 30, 2024 (All day)
Lane Drop - Multi Lane Road
Tutt St 2755 - crane to hosit glass to 5th floor deck. Sidewalk closed. Sidewalk closure signs posted and pedestrians detoured to other side of street.
Permit number: RUP2024-0020
Project contact: Brian Fry
Phone: 250-300-8802
RAYMER AVE to OSPREY AVE
January 23, 2024 -
7:00am to 12:00pm
Single Lane Alternating
Various City Streets - no excavation required. Tree maintenance and traffic impedance only.
Permit number: RUP2024-0009
Project contact: Simon Carrol
Phone: 250-870-0954
ENTERPRISE WAY to LECKIE PL
January 18, 2024 -
9:00am to 3:00pm
No Disruption
Wardlaw Ave 602 - unloading and unloading materials. Intermittent Ongoing thru the end of the year to manage deliveries only
Permit number: RUP2024-0019
Project contact: Lance Beaudoin
PANDOSY ST to RICHTER ST
January 1, 2024 - 8:00am to October 31, 2024 - 6:00pm
Single Lane Alternating
Wardlaw Ave 640 - use of front street parking and sidewalk for site office, garbage disposal, storage trailers and loading and unload of trucks. Site will be fully fenced.
Permit number: RUP2023-0964
Project contact: Kimberly Rose
PANDOSY ST to RICHTER ST
January 1, 2024 (All day) to April 30, 2024 (All day)
Single Lane Alternating
Water Main Blow-Off Repair - Dunster Rd 2990
Permit number: RUP2024-0043
EAST KELOWNA RD to EAST END OF ROAD
January 10, 2024 - 7:00am to January 19, 2024 - 3:00pm
Single Lane Alternating
Water Service Curb Stop Repair - Gordon Dr 4792
Permit number: RUP2024-0058
Project contact: Cody Beitel
STEELE RD to PARET RD
January 13, 2024 - 9:00am to January 19, 2024 - 3:00pm
No Disruption
Water Service Repair - Ethel St 1005
Permit number: RUP2024-0059
Project contact: Jens Petersen
Phone: 250-469-8424
WEDDELL PL to CROWLEY AVE
January 15, 2024 - 12:00pm to January 17, 2024 - 3:00pm
Emergent Work, No Disruption
Water St 1659 / Leon Ave - errect scafolding to close portion of walkway at the corner to work on building.
Permit number: RUP2024-0008
Project contact: Thomas Scheffer
Phone: 778-214-7214
WATER ST to PANDOSY ST
January 5, 2024 - 7:00am to February 23, 2024 - 4:00pm
No Disruption
HARVEY AVE to LEON AVE
January 5, 2024 - 7:00am to February 23, 2024 - 4:00pm
No Disruption
WATER ST to PANDOSY ST
January 5, 2024 (All day) to February 23, 2024 (All day)
HARVEY AVE to LEON AVE
January 5, 2024 (All day) to February 23, 2024 (All day)
Weddell/Richter Ethel Traffic Control Training - 2024
Permit number: RUP2023-0984
Project contact: Alex Johnson
CROWLEY AVE to ETHEL ST
February 4, 2024 -
8:30am to 4:30pm
Single Lane Alternating
RICHTER ST to ETHEL ST
February 25, 2024 -
9:00am to 4:30pm
Single Lane Alternating
RICHTER ST to ETHEL ST
February 4, 2024 -
8:30am to 4:30pm
Single Lane Alternating
WEDDELL PL to CROWLEY AVE
February 25, 2024 -
9:00am to 4:30pm
Single Lane Alternating
WEDDELL PL to CROWLEY AVE
February 4, 2024 -
8:30am to 4:30pm
Single Lane Alternating
BAILLIE AVE to RECREATION AVE
February 25, 2024 -
9:00am to 4:30pm
Single Lane Alternating
BAILLIE AVE to RECREATION AVE
February 4, 2024 -
8:30am to 4:30pm
Single Lane Alternating
RECREATION AVE to WEDDELL PL
February 25, 2024 -
9:00am to 4:30pm
Single Lane Alternating
RECREATION AVE to WEDDELL PL
February 4, 2024 -
8:30am to 4:30pm
Single Lane Alternating
WEDDELL PL to ETHEL ST
February 25, 2024 -
9:00am to 4:30pm
Single Lane Alternating
WEDDELL PL to ETHEL ST
February 4, 2024 -
8:30am to 4:30pm
Single Lane Alternating
RICHTER ST to CROWLEY AVE
February 25, 2024 -
9:00am to 4:30pm
Single Lane Alternating
RICHTER ST to CROWLEY AVE
February 4, 2024 -
8:30am to 4:30pm
Single Lane Alternating
BAILLIE AVE to BAILLIE AVE
February 4, 2024 -
8:30am to 4:30pm
Single Lane Alternating
BAILLIE AVE to BAILLIE AVE
February 4, 2024 -
8:30am to 4:30pm
Single Lane Alternating
BAILLIE AVE to BAILLIE AVE
February 25, 2024 -
9:00am to 4:30pm
Single Lane Alternating
BAILLIE AVE to BAILLIE AVE
February 25, 2024 -
9:00am to 4:30pm
Single Lane Alternating
CROWLEY AVE to ETHEL ST
February 25, 2024 -
9:00am to 4:30pm
Single Lane Alternating