We're working to create vibrant urban centres, a balanced transportation network and an inclusive community. Infrastructure projects improve and maintain outdoor spaces, buildings, active transportation networks, utilities, roads and bridges.
A fully accessible playground structure will be installed at Strathcona Beach Park this Spring.
The City is constructing Phase 1 of the Aerated Static Pile Composting System. The composting system will receive municipal yard waste and produce ~143 tonnes/day of...
The Altura Rd Fire Flow Watermain Upgrade project will provide a new 200mm diameter PVC main improving Fire Flows to the surrounding homes.
Abandon existing infrastructure at Ash Rd site. Install 400m of watermain and a new, above ground PRV kiosk at the intersection of Viewcrest Rd and Viewcrest Ct.
...This project was identified as a priority neighbourhood park within the DCC program, as the surrounding area has witnessed significant residential development over the...
Installation of 150m of Sanitary Sewer on Beaver Lake Rd, extending the existing system from Beaver Lake Ct heading east to the Lake country Wastewater Treatment Plant....
The existing storm main carrying Brandt’s Creek has degraded due to root intrusion which requires repairing.