Current capital projects
We're working to create vibrant urban centres, a balanced transportation network and an inclusive community. Infrastructure projects improve and maintain outdoor spaces, buildings, active transportation networks, utilities, roads and bridges.
Replace AHU 6&7 and both BKM's. All equipment is end of life and only one remaining AHU is operable.
Watermain replacement on Hazell Rd between Gordon Dr and Torrs Rd, along with new water services. Continuation of work completed in 2022.
Original lift station was installed in 1989 with all original components still in place, which have reached the end of its life cycle.
The Houghton Road Active Transportation Corridor (ATC) forms part of the City of Kelowna’s Pedestrian and Bicycle Master Plan (2016) and is intended to provide the...
Both right turns entering and exiting Hwy. 33 from Ziprick Rd will be modified to "Smart Right Channels", which maintains a better angle for drivers to view oncoming...
As part of the approval requirements for the Central Green Development project at Hwy.
Irrigation Renewal is an annual program that receives allocated funding each year for the replacement and upgrading of aging irrigation systems in parks, landscape areas...
Replace pool dehumidification system, replace rooftop units with variable refrigerant flow and air source heat pumps, install water source heat pumps, demand control...
Kelowna Memorial Park Cemetery Improvements is an annual program that receives allocated funding each year for the replacement and upgrading of aging infrastructure....
Kelowna's Newest Waterfront Park - Phase 1
- ‹ previous
- 4 of 9
- next ›